Resurfacing on Kraft Ave. Begins August 5
Kraft Avenue
Limits: 76th Street and Broadmoor Avenue
Project Type: Resurfacing
Detour: Yes
Start: August 5
Projected Completion: August 26
KCRC Project Engineer: Jeff Kocsis
Contractor: Superior Asphalt
Project Details: The resurfacing project on Kraft Avenue between 76th Street and Broadmoor Avenue is scheduled to begin August 5 (weather dependent). The existing asphalt surface will be crushed, regraded and compacted and then covered with Hot Mix Asphalt (HMA).
The section of Kraft Avenue will be closed to through traffic for the duration of the project, which is scheduled to be completed by August 26. The detour, below, will be posted.