Major Road Projects

Category Navigation

13 Mile Road

Schedule Date: June 2019

Location Detail: Peach Ridge Ave. to M-37

Crush and shape existing asphalt surface and resurface with 2 courses of HMA (hot mix asphalt).  Through traffic will be detoured 

Go Back
x

Subscribe to our mailing list

* indicates required