Major Road Projects

Category Navigation

6 Mile Road

Schedule Date: 2020 - TBD

Location Detail: Fruit Ridge Ave. to Walker Ave.

Crush and Shape the existing 3-lane asphalt surface and resurface with 2 courses of HMA (hot asphalt mix).  Through traffic will be detoured.

Go Back
x

Subscribe to our mailing list

* indicates required