Major Road Projects

Category Navigation

7 Mile Road

Schedule Date: 2019 - TBD

Location Detail: Fruit Ridge Ave. to Alpine Ave.

Crush and shape the existing asphalt surface and resurface with 2 courses of HMA (hot mix asphalt).  Through traffic will be detoured.

Go Back
x

Subscribe to our mailing list

* indicates required