76th Street (Proposed)

Schedule Date: 2019 Construction Season

Location Detail: Clyde Park Avenue and Gordon Industrial Drive

The proposed project includes the widening of 76th Street to five lanes between Clyde Park Avenue and Gordon Industrial Drive during 2019. Work includes road, bridge and railroad crossing widening, steel piling, precast bridge segments, sand subbase, aggregate base, concrete curb and gutter, asphalt paving, pavement markings and restoration.

A Project Information Open House has been scheduled on December 13, 2018 between 4:00 p.m. and 6:00 p.m. at Byron Township Hall located at 8085 Byron Center Avenue in Byron Center. There is  no planned  presentation;  therefore, those interested may arrive anytime between 4:00 p.m. and 6:00 p.m.

Information

The purpose of the open house is to provide property owners and businesses an opportunity to review and comment on the preliminary plans for this road and bridge widening project. KCRC representatives will be present to answer questions about the proposed construction. If you are not able to attend the open house, but have questions about the project; please call Wayne Harrall, Deputy Managing Director of Engineering, at (616) 242-6914.

Go Back
x

Sign up for KCRC News