Schedule Date: 2019 - TBD

Location Detail: Local Road Paving Projects

The following is a list of paving projects currently proposed/scheduled for the 2019 construction season. These projects are cost-shared between the township and the Kent County Road Commission.

Information

Road Improvement Project: Full Mill & Fill

Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer - and in some cases the entire asphalt pavement thickness - with a milling machine and the replacement of the milled location with new asphalt. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. curbs, driveways) must be met.

Contractor: Superior

Roads receiving improvement:

  • Brandywyne Dr. (Lantern Dr. NW to Stoney Creek Ave.)
  • Woodrush Ln. (Chasseral NW Dr. to End)
  • Woodrush Ct. (Woodrush Ln. to End)

Full Crush & Shape 

  • Walker Ave. (5 Mile Rd. NW to 6 Mile Rd.)