Schedule Date: April 22 - May 8, 2019

Location Detail: Local Road Paving Projects

The following is a list of local road paving projects currently proposed/scheduled for the 2019 construction season. Local roads are typically shorter distance, two-lane collector roads and residential streets. Local road projects are cost-shared between the township and the Kent County Road Commission.

Information

Road Improvement Project: Full Mill & Fill

Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer - and in some cases the entire asphalt pavement thickness - with a milling machine and the replacement of the milled location with new asphalt. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. curbs, driveways) must be met.

Contractor: Superior

Roads receiving improvement:

April 22 -May 8, 2019

  • Brandywyne Dr. (Lantern Dr. NW to Stoney Creek Ave.)
  • Woodrush Ln. (Chasseral NW Dr. to End)
  • Woodrush Ct. (Woodrush Ln. to End)

April 22 - May 10, 2019