Schedule Date: 2019 _ TBD

Location Detail: Local Road Paving Projects

The following is a list of paving projects currently proposed/scheduled for the 2019 construction season. These projects are cost-shared between the township and the Kent County Road Commission.

Information

Road Improvement Project: Partial Mill & Fill

Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer - and in some cases the entire asphalt pavement thickness - with a milling machine and the replacement of the milled location with new asphalt. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. curbs, driveways) must be met.

Contractor: Superior

Roads receiving improvement:

  • Northpoaint Dr. (Woodspoint Dr. to Crownpoint Dr.)
  • Northpoint Ct. (Northpoint Dr. to End)
  • Crownpoint Dr. (Woodspoind Dr. to Clyde Park Ave.)
  • W Crownpoint Ct. (Crownpoint Dr. to End)
  • E Crownpoint Ct. (Crownpoint Dr. to End)
  • Kingtree Dr. (Crownpoint Dr. to Northpoint Dr.)
  • Kingtree Ct. (Kingtree Dr. to End)
  • Woodspoint Dr. Clyde Park Ave. to 64th St.)
  • Woodspont Ct. (Woodspoint Dr. to End)
  • Southpoint Ct. (Woodspoint Dr. to End)
  • Highmeadow Dr. (68th St. to Woodspoint Dr.)
  • Highmeadow Ct. (Woodspoint Dr. to End)
  • Northmeadow Dr. (Woodspoint Dr. W. 500')
  • Planters Row Dr. (Burlingame Ave. to End)
  • Mycah Dr. (Hightree Dr. to Burlingame Ave.)
  • Heirloom Dr. (Restoration Dr. to Planters Row Dr.)
  • Resoration Dr. (End to End)
  • Pavillion Dr. (Stanchion Dr. to Restoration Dr.)
  • Nostalgia Dr. (Conifer Ridge Dr. to Restoration Dr.)
  • Conifer Ridge Dr. (Stanchion Dr. to Nostalgia Dr.)
  • Conifer Ridge Dr. (Byron Center Ave. to Stanchion Dr.)
  • Stanchion Dr. (S of Conifer Ridge to North End)