Schedule Date: April - May 2019

Location Detail: Local Road Paving Projects

The following is a list of local road paving projects currently proposed/scheduled for the 2019 construction season. Local roads are typically shorter distance, two-lane collector roads and residential streets. Local road projects are cost-shared between the township and the Kent County Road Commission.

Information

Road Improvement Project: Full Mill & Fill

Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer - and in some cases the entire asphalt pavement thickness - with a milling machine and the replacement of the milled location with new asphalt. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. curbs, driveways) must be met.

Contractor: Michigan Paving

Roads receiving improvement:

  • Old Mission Dr. (Danboro Ave. to Danboro Ave.)
  • Danboro Dr. (Cannon Farms Dr. to Old Mission Dr.)
  • Norman Farms Dr. (Myers Lake Ave. to Danboro Dr.)
  • Verde Vista Dr. (Bella Vista Dr. to End)
  • Buena Vista Ct. (Verde Vista Dr. to End)
  • W Encantado Ct. (Verde Vista Dr. to End)
  • E Encantado Ct. (Verde Vista Dr. to End)
  • Bonaire Dr. (Bella Vista Dr. to Bonaire Ct.)
  • Bonaire Ct. (End to End)
  • Ague Vista Ct. (Belding Rd. to End)
  • Bonita Vista Ct. (Belding Rd. to End)

Top Course paving schedule May 28:

  • Vista Grande Dr. (Belding Rd. to End)
  • Vista De Oro Dr. (Vista Grande Dr. to End)
  • Via Nuevo Dr. (Vista De Oro Dr. to Blakely Dr.)
  • Vista De Oro Ct. (Vista De Oro Dr. to End)
  • Hermoso Ct. (Vista De Oro Dr. to End)

 

  • Vista Royale Ln. (Courtland Dr. to End)
  • Royale Ct. (Vista Royale Ln. to End)
  • Siesta Dr. (Vista Royale Ln. to Cristo Dr.)
  • Cristo Dr. (Vista Royale Ln. to End)
  • Surf Dr. (Vista Royale Ln. to Courtland Dr.)
  • Vista Royale Ct. (Vista Royale Ln. to End)