Cascade Road

Schedule Date: June 24 - June 28, 2019

Location Detail: Forest Hill Ave. to Spaulding Ave.

Full-depth mill and fill. This includes cold milling (removing) the existing 5-lane asphalt surface and resurfacing with 7.5 inches of HMA (hot mix asphalt).  Two-way traffic will be maintained. 

Information

Contractor: Rieth-Riley Construction