Major Road Projects

Category Navigation

Courtland Township

Schedule Date: 2019 - TBD

Location Detail: Local Road Paving Projects

The following is a list of paving projects currently proposed/scheduled for the 2019 construction season. These projects are cost-shared between the township and the Kent County Road Commission.

Information

Road Improvement Project: Full Mill & Fill

Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer - and in some cases the entire asphalt pavement thickness - with a milling machine and the replacement of the milled location with new asphalt. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. curbs, driveways) must be met. 

Roads receiving improvement:

  • Foxtail Meadows Dr. (Shaner Ave. to End)
  • Foxtail Meadows Ct.(Foxtail Meadows Dr. to End)
  • Becker Creek Ct. (Porter Hollow Dr. to End)
  • Shaw Creek Ct. (Courtland Dr. to End)
  • Hessler Dr. (11 Mile Rd. to Hessler Ct.)

Contractor: Rieth-Riley

  • Stegman Forest Ct. (13 Mile Rd. to End) 
Go Back
x

Subscribe to our mailing list

* indicates required