Schedule Date: 2019

Location Detail: Local Road Paving Projects

The following is a list of local road paving projects currently proposed/scheduled for the 2019 construction season. Local roads are typically shorter distance, two-lane collector roads and residential streets. Local road projects are cost-shared between the township and the Kent County Road Commission.

Information

Road Improvement Project: Partial Mill & Fill

Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer - and in some cases the entire asphalt pavement thickness - with a milling machine and the replacement of the milled location with new asphalt. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. curbs, driveways) must be met.

Roads receiving improvement:

  • Cornerstone Dr. (Eastsone St. to 68th St.)
  • Eastsone St. (Cornerstone Dr. to Shady Knoll Dr.)
  • Shady Knoll Dr. (including Pebblestone Dr., Sahdy Knoll Dr. to Hartman Dr.)
  • Hartman Dr. (Shady Knoll Dr. to End)
  • Glen Canyon Dr. (Crystalview Dr. to Shady Knoll Dr.)
  • Meadowgrass Ct. (Glen Canyon Dr. to End)
  • Crystaline Dr. (Kalamazoo Ave. to End)
  • Crystaline Ct. ( Crystaline Dr. to End)
  • Placid Point Ct. (Penncross Dr. to End)
  • Penncross Ct. (Penncross to End)