Schedule Date: July 8 - July 13, 2019

Location Detail: Local Road paving Projects

The following is a list of local road paving projects currently proposed/scheduled for the 2019 construction season. Local roads are typically shorter distance, two-lane collector roads and residential streets. Local road projects are cost-shared between the township and the Kent County Road Commission.

Information

Road Improvement Project: Full Mill & Fill

Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer - and in some cases the entire asphalt pavement thickness - with a milling machine and the replacement of the milled location with new asphalt. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. curbs, driveways) must be met.

Contractor: Superior

Roads receiving improvement:

  • Eaglecrest Dr. (Leonard St. to E Beltline Ave.)
  • Lamberton Lake Dr. (Plainfield Ave. to Oakcliff Dr.)
  • Scenicview Dr. (4 Mile Rd. to End)
  • Canyonside Ct. (Bird Ave. to End)
  • Hylane Ave. (3 Mile Rd. to Pvt. Dri.)
  • Shadowlane Dr. (Hyline Ave. to End)
  • Carlton Ave South (4 Mile Rd. to End)

July 16, 2019
1.5" Mill and Fill

  • Dunigan Ave (Knapp St. to 2750' North)