Major Road Projects

Category Navigation

Hudson Street

Schedule Date: June 11-June 19, 2018 (completed in phases)

Location Detail: Grand River Drive to northern Lowell city limits

About: Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer with a milling machine and the replacement of the milled location with new asphalt. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. curbs, driveways) must be met. For this project, 2 inches of existing asphalt will be removed and replaced with 2 inches of hot mix asphalt (HMA).

Information

Phase 1
Limits: Grand River Drive to Main Street
Schedule: June 11 – June 12
Traffic: Closed to through traffic, open to local residents and businesses; detour posted

Phase 2
Limits: Main Street (M-21) to Northern Lowell city limits (South of Lincoln Lake Avenue)
Schedule: June 12 – June 22
Traffic: Lane closures; two-way traffic maintained

Contractor: Rieth-Riley Construction