Paramount Drive, Castle Rock Drive, Cinema Drive, West River Center and Shank St

Schedule Date: 19June 5-June 19, 2018

Location Detail: Off M-44

​Project: Mill & Fill, work will be completed with closures for through traffic.

 

Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer - and in some cases the entire asphalt pavement thickness - with a milling machine and the replacement of the milled location with new asphalt. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. curbs, driveways) must be met.

Information

​Paramount Drive (M-44 to end)
Castle Rock Drive (Paramount Drive to Cinema Drive)
Cinema Drive (End to end)
West River Center Drive (West River to cul-de-sac)
Shank St. (Northland to Northway)
 

Contractor: Michigan Paving