Completed - 2017 Improvement Projects

KCRC's Major Primary Road Improvement Projects of 2016 are divided among "Current," "Future," and "Completed."  Short-term Projects are not listed below. 

Work has recently concluded on the following projects. Click a project of interest for more details.

10 Mile Road

US 131 to Meijer Driveway; Childsdale Ave to Rogue River

September 11 - October 2017

This project includes 0.62 miles of hot mix asphalt cold milling and resurfacing and concrete divider removal on 10 Mile Road from the US-131northbound ramps to east of Belmont Avenue, from east of Belmont Avenue to east of Meijer Drive and from Childsdale Avenue to Rogue River Bridge. 

Learn More

13 Mile Road at Alpine Avenue

July 10 - August 10

The project will consist of widening for a left turn lane on 13 Mile Road east and west of Alpine Avenue. Work includes concrete curb and gutter, storm sewer, block retaining wall, asphalt pavement, pavement markings, and restoration.

Learn More

28th Street and Kraft Avenue

August 21 - November 11, 2017

The project will consist of widening the north side of 28th Street east and west of Kraft Avenue to provide for a dual left-turn lane on 28th Street and right-turn lane extension west of Kraft Avenue.  Kraft Avenue will be widened north and south of 28th Street to accommodate dual left turns off 28th Street and provide dual through movements on Kraft Avenue north and south of 28th Street.  The existing traffic signal will also be upgraded to accommodate for the new lanes. 

Learn More

60th Street

Bancroft Avenue to M-50 (Alden Nash Avenue)

July 11 - July 22, 2017

Crush & Shape is a structural pavement treatment that grinds, or crushes, the existing asphalt and 1-2” of underlying gravel. The material is then regraded, compacted and, covered with Hot Mic Asphalt (HMA). For this project, the material will be covered with one course of HMA, two inches deep.

Learn More

64th Street

Ivanrest Avenue to Byron Center Avenue

June 6 - June 24, 2017

The existing asphalt surface will be crushed, regraded and compacted and then covered with Hot Mix Asphalt (HMA). 

Learn More

68th Street at Patterson Avenue

Intersection

July 31 - September 22

The project will  upgrade existing traffic signal with box span configuration, LED signal heads, and updated detection. As part of the traffic signal modernization project, sidewalk ramps will be installed to provide access to the pedestrian signal push buttons. 

Learn More

76th Street

Hanna Lake to Patterson Avenue

October 23 - November 6

For this paving project, existing blacktop will be cold milled and replaced with one two-inch course of new Hot Mix Asphalt (HMA) 3C.

Learn More

84th Street at Clyde Park Avenue

Intersection

September 25 - October 24, 2017

The project will  upgrade existing traffic signal with box span configuration, LED signal heads, and updated detection. As part of the traffic signal modernization project, sidewalk ramps will be installed to provide access to the pedestrian signal push buttons. 

Learn More

92nd Street

Byron Center Avenue to Burlingame Avenue

May 15 - June 2, 2017

For this resurfacing project, the existing asphalt surface will be crushed, regraded and compacted and then covered with Hot Mix Asphalt (HMA). 

Learn More

Alta Dale Avenue

M-21 to Grand River Drive

August 7 - August 12, 2017

Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer - and in some cases the entire asphalt pavement thickness - with a milling machine and the replacement of the milled location with new asphalt. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. curbs, driveways) must be met.

Learn More

Bowne Bridge No 26 (Freeport Avenue)

Freeport Avenue approximately .3 miles north of 100th Street

July 12 - August 26, 2017

This project will replace the existing jack-arch bridge with a precast box culvert. 

Learn More

Burton Street

Cascade Rd to Cascade Point PVT

April 24 - April 27, 2017

Project involves the removal of the existing surface layer and the replacement of the milled location with new asphalt. 

Learn More

Byron Center Avenue

84th Street to 64th Street

May 30 - July 7, 2017

Cold Mill the existing 4-lane and 5-lane asphalt surface . Resurface with HMA pavement and restripe a 3-lane configuration between 84th Street and 76th Street.  The project will be done in phases to maintain 2-way traffic.

Learn More

Caledonia Trails

M-37 and 100th St southeasterly to 108th St

Construction of a 10 foot wide asphalt non-motorized trail extending from the existing Paul Henry Thornapple Trail in the Village of Caledonia south and east, crossing the M-37 & 100th Street signalized intersection to the unimproved railroad bed, and continuing southeasterly to 108th Street connecting to the improved trail in Barry County.  Local match provided by Caledonia Township.

Learn More

Camelot Avenue

10 Mile Road - Squires Street

June 20 - June 30, 2017

Work will include cold-milling existing asphalt on the outside and replacing with one course of HMA overlay.

Learn More

Cannonsburg Road at Myers Lake Avenue

Intersection Widening and Driveway Realignment

August 21 - September 30, 2017

Intersection Realignment to line up Cannonsburg Ski Resort Commercial Driveway with Myers Lake Avenue. Project will include trenching, underdrain installation, roadway widening, cold milling and HMA paving. A left-hand turn lane will be installed for EB and WB Cannonsburg Road at the new intersection. EB Cannonsburg Road will also feature a throughlane and dedicated right-turn lane at the ski resort.

Learn More

Chauncey Avenue

Cannonsburg Road south to end of pavement

June 12 - June 30, 2017

For this resurfacing project, the existing asphalt surface will be crushed, regraded and compacted and then covered with Hot Mix Asphalt (HMA). 

Learn More

Hendershot Avenue

4 Mile Road to 6 Mile Road

June 14- - June 30, 2017

For this resurfacing project, the existing asphalt surface will be crushed, regraded and compacted and then covered with Hot Mix Asphalt (HMA). 

Learn More

Herrington Avenue

Belmont Avenue to Chandler Avenue

June 19 - June 30

Crush & Shape is a structural pavement treatment that grinds, or crushes, the existing asphalt and 1-2” of underlying gravel. The material is then regraded, compacted and covered with Hot Mix Asphalt (HMA). 

Learn More

Hudson Street Bridge

Over the Grand River - just north of Grand River Drive

June 14 - June 21, 2017

This work is associated with the bridge's 2015 rehabilitation project, which included the removal of the top portion of the bridge’s deck surface, replacement of bridge expansion joints, and placement of a new driving surface. This supplemental work includes final maintenance and sealing the deck bridge.

Learn More

Hull Street

Division Avenue to Pine Island Drive

June 20 - July 7

Crush & Shape is a structural pavement treatment that grinds, or crushes, the existing asphalt and 1-2” of underlying gravel. The material is then regraded, compacted and covered with Hot Mix Asphalt (HMA). 

Learn More

Ivanrest Avenue

108th Street to 100th Street

May 15 to June 2, 2017

For this resurfacing project, the existing asphalt surface will be crushed, regraded and compacted and then covered with Hot Mix Asphalt (HMA). The project is being done to extend the service life of the road.

 

Learn More

Jasperse Avenue and Bradfield Street (Bradfield complete)

August 7 - August 14, 2017

Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer - and in some cases the entire asphalt pavement thickness - with a milling machine and the replacement of the milled location with new asphalt. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. curbs, driveways) must be met.

Learn More

Je-Ne-Be Drive and NE Street

June 19 - June 30, 2017

Existing asphalt will be cold-milled and replaced with two courses of new Hot Mix Asphlat (HMA).

Learn More

Jupiter Avenue Bridge (Plainfield Bridge #24)

Jupiter Avenue over the Grand River, south of West River Drive

July 10 - September 15, 2017

The preventative maintenance project will be completed in two phases: The first phase will include concrete approach pavement repair, and expansion joint installation. The second phase will include shot blasting the entire deck surface and sealing with an epoxy-based sealer.  

JUPITER AVENUE UPDATE (August 9): The Jupiter Avenue bridge project is proceeding on schedule and all lanes are currently open to traffic. The concrete and expansion joint repairs on the bridge have been completed and the only work that remains is to apply an epoxy seal to the bridge deck. Before the epoxy seal can be added, the concrete repairs must cure for 28 days. Therefore, we anticipate that in 3 to 4 weeks, limited lane closures will be put back into place in order to apply the epoxy seal, which takes about one week to complete. During the epoxy seal process, at least one lane of traffic in each direction will remain in place

Learn More

Kalamazoo Avenue

84th Street to 76th Street

April 3 - May 22, 2017

This project will provide for a three-lane roadway, one lane in each direction and a center turn lane. Work includes tree removal, culvert replacement, ditches, earthwork, grading, sand subbase, aggregate base, asphalt paving, pavement markings and restoration. Gaines Township will be funding sanitary sewer extension to 84th Street and sidewalk extension north to 76th Street.  

Learn More

Lappley Avenue

14 Mile Rd to 15 Mile Rd

April 25 - September 1, 2017

The reconstruction/improvement project includes necessary grading, drainage, subbase, aggregate base and construction to provide for roadway with HMA surfacing.

Learn More

Packer Drive

Rogue River Road to VanDam Avenue

July 24 - August 4, 2017

Crush & shape and resurface between VanDam Drive and the Rogue River Bridge.
Cold mill and resurface between the Rogue River Bridge and Rogue River Road.

Crush & Shape is a structural pavement treatment that grinds, or crushes, the existing asphalt and 1-2” of underlying gravel. The material is then regraded, compacted and covered with Hot Mix Asphalt (HMA). Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer with a milling machine and the replacement of the milled location with new asphalt.

Learn More

Peach Ridge Avenue

10 Mile Road - 12 Mile Road

July 7 - July 22

Crush & Shape is a structural pavement treatment that grinds, or crushes, the existing asphalt and 1-2” of underlying gravel. For this project, the material is then regraded, compacted and covered with two inch, 3C Hot Mix Asphalt (HMA). 

Learn More

Pine Island Drive

10 Mile Road to 13 Mile Road

October 25 - October 27, 2017

Project consists of Spot cold milling existing Hot Mix Asphalt (HMA) and placing new HMA.

Learn More

Ritchie Avenue

15 Mile Road to 16 Mile Road

May 22, 2017 to June 9, 2017

For this resurfacing project, the existing asphalt surface will be crushed, regraded and compacted and then covered with Hot Mix Asphalt (HMA). The project is being done to extend the service life of the road.

Learn More

Spencer Bridge #6 (21 Mile Road)

21 Mile Road over Black Creek, .5 Mile east of Keller Ave

July 17 - September 22, 2017

Remove existing triple corrugated metal pipe arches and install twin precast concrete box culverts. 

Learn More

Taos Drive

M-21 to Gravel

August 7 - August 12

Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer - and in some cases the entire asphalt pavement thickness - with a milling machine and the replacement of the milled location with new asphalt. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. curbs, driveways) must be met.

Learn More

Whitneyville Avenue at 68th Street

Intersection

September 11 - October 31, 2017

Project will consist of widening both Whitneyville Avenue and 68th Street to provide dedicated left-turn lanes and wider paved shoulders.  Project will be done under through traffic with the exception of a 2 to 3-day period where the intersection will be closed to through traffic to allow for concrete removal. Message boards announcing the closure will be posted one week in advance and a detour will be posted.

Learn More

Click an icon below to learn more about a project.

Colored areas on the map indicate Kent County cities and villages NOT within KCRC jurisdiction.

10 Mile Road

US 131 to Meijer Driveway; Childsdale Ave to Rogue River

September 11 - October 2017

Mill & Fill

This project includes 0.62 miles of hot mix asphalt cold milling and resurfacing and concrete divider removal on 10 Mile Road from the US-131northbound ramps to east of Belmont Avenue, from east of Belmont Avenue to east of Meijer Drive and from Childsdale Avenue to Rogue River Bridge. 

Learn More

13 Mile Road at Alpine Avenue

July 10 - August 10

The project will consist of widening for a left turn lane on 13 Mile Road east and west of Alpine Avenue. Work includes concrete curb and gutter, storm sewer, block retaining wall, asphalt pavement, pavement markings, and restoration.

Learn More

28th Street and Kraft Avenue

August 21 - November 11, 2017

The project will consist of widening the north side of 28th Street east and west of Kraft Avenue to provide for a dual left-turn lane on 28th Street and right-turn lane extension west of Kraft Avenue.  Kraft Avenue will be widened north and south of 28th Street to accommodate dual left turns off 28th Street and provide dual through movements on Kraft Avenue north and south of 28th Street.  The existing traffic signal will also be upgraded to accommodate for the new lanes. 

Learn More

60th Street

Bancroft Avenue to M-50 (Alden Nash Avenue)

July 11 - July 22, 2017

Crush & Shape

Crush & Shape is a structural pavement treatment that grinds, or crushes, the existing asphalt and 1-2” of underlying gravel. The material is then regraded, compacted and, covered with Hot Mic Asphalt (HMA). For this project, the material will be covered with one course of HMA, two inches deep.

Learn More

64th Street

Ivanrest Avenue to Byron Center Avenue

June 6 - June 24, 2017

Crush & Shape

The existing asphalt surface will be crushed, regraded and compacted and then covered with Hot Mix Asphalt (HMA). 

Learn More

68th Street at Patterson Avenue

Intersection

July 31 - September 22

The project will  upgrade existing traffic signal with box span configuration, LED signal heads, and updated detection. As part of the traffic signal modernization project, sidewalk ramps will be installed to provide access to the pedestrian signal push buttons. 

Learn More

76th Street

Hanna Lake to Patterson Avenue

October 23 - November 6

For this paving project, existing blacktop will be cold milled and replaced with one two-inch course of new Hot Mix Asphalt (HMA) 3C.

Learn More

84th Street at Clyde Park Avenue

Intersection

September 25 - October 24, 2017

The project will  upgrade existing traffic signal with box span configuration, LED signal heads, and updated detection. As part of the traffic signal modernization project, sidewalk ramps will be installed to provide access to the pedestrian signal push buttons. 

Learn More

92nd Street

Byron Center Avenue to Burlingame Avenue

May 15 - June 2, 2017

Crush & Shape

For this resurfacing project, the existing asphalt surface will be crushed, regraded and compacted and then covered with Hot Mix Asphalt (HMA). 

Learn More

Alta Dale Avenue

M-21 to Grand River Drive

August 7 - August 12, 2017

Mill & Fill

Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer - and in some cases the entire asphalt pavement thickness - with a milling machine and the replacement of the milled location with new asphalt. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. curbs, driveways) must be met.

Learn More

Bowne Bridge No 26 (Freeport Avenue)

Freeport Avenue approximately .3 miles north of 100th Street

July 12 - August 26, 2017

This project will replace the existing jack-arch bridge with a precast box culvert. 

Learn More

Burton Street

Cascade Rd to Cascade Point PVT

April 24 - April 27, 2017

Mill & Fill

Project involves the removal of the existing surface layer and the replacement of the milled location with new asphalt. 

Learn More

Byron Center Avenue

84th Street to 64th Street

May 30 - July 7, 2017

Cold Mill the existing 4-lane and 5-lane asphalt surface . Resurface with HMA pavement and restripe a 3-lane configuration between 84th Street and 76th Street.  The project will be done in phases to maintain 2-way traffic.

Learn More

Caledonia Trails

M-37 and 100th St southeasterly to 108th St

Construction of a 10 foot wide asphalt non-motorized trail extending from the existing Paul Henry Thornapple Trail in the Village of Caledonia south and east, crossing the M-37 & 100th Street signalized intersection to the unimproved railroad bed, and continuing southeasterly to 108th Street connecting to the improved trail in Barry County.  Local match provided by Caledonia Township.

Learn More

Camelot Avenue

10 Mile Road - Squires Street

June 20 - June 30, 2017

Work will include cold-milling existing asphalt on the outside and replacing with one course of HMA overlay.

Learn More

Cannonsburg Road at Myers Lake Avenue

Intersection Widening and Driveway Realignment

August 21 - September 30, 2017

Intersection Realignment to line up Cannonsburg Ski Resort Commercial Driveway with Myers Lake Avenue. Project will include trenching, underdrain installation, roadway widening, cold milling and HMA paving. A left-hand turn lane will be installed for EB and WB Cannonsburg Road at the new intersection. EB Cannonsburg Road will also feature a throughlane and dedicated right-turn lane at the ski resort.

Learn More

Chauncey Avenue

Cannonsburg Road south to end of pavement

June 12 - June 30, 2017

Crush & Shape

For this resurfacing project, the existing asphalt surface will be crushed, regraded and compacted and then covered with Hot Mix Asphalt (HMA). 

Learn More

Hendershot Avenue

4 Mile Road to 6 Mile Road

June 14- - June 30, 2017

Crush & Shape

For this resurfacing project, the existing asphalt surface will be crushed, regraded and compacted and then covered with Hot Mix Asphalt (HMA). 

Learn More

Herrington Avenue

Belmont Avenue to Chandler Avenue

June 19 - June 30

Crush & Shape

Crush & Shape is a structural pavement treatment that grinds, or crushes, the existing asphalt and 1-2” of underlying gravel. The material is then regraded, compacted and covered with Hot Mix Asphalt (HMA). 

Learn More

Hudson Street Bridge

Over the Grand River - just north of Grand River Drive

June 14 - June 21, 2017

This work is associated with the bridge's 2015 rehabilitation project, which included the removal of the top portion of the bridge’s deck surface, replacement of bridge expansion joints, and placement of a new driving surface. This supplemental work includes final maintenance and sealing the deck bridge.

Learn More

Hull Street

Division Avenue to Pine Island Drive

June 20 - July 7

Crush & Shape

Crush & Shape is a structural pavement treatment that grinds, or crushes, the existing asphalt and 1-2” of underlying gravel. The material is then regraded, compacted and covered with Hot Mix Asphalt (HMA). 

Learn More

Ivanrest Avenue

108th Street to 100th Street

May 15 to June 2, 2017

Crush & Shape

For this resurfacing project, the existing asphalt surface will be crushed, regraded and compacted and then covered with Hot Mix Asphalt (HMA). The project is being done to extend the service life of the road.

 

Learn More

Jasperse Avenue and Bradfield Street (Bradfield complete)

August 7 - August 14, 2017

Mill & Fill

Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer - and in some cases the entire asphalt pavement thickness - with a milling machine and the replacement of the milled location with new asphalt. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. curbs, driveways) must be met.

Learn More

Je-Ne-Be Drive and NE Street

June 19 - June 30, 2017

Mill & Fill

Existing asphalt will be cold-milled and replaced with two courses of new Hot Mix Asphlat (HMA).

Learn More

Jupiter Avenue Bridge (Plainfield Bridge #24)

Jupiter Avenue over the Grand River, south of West River Drive

July 10 - September 15, 2017

The preventative maintenance project will be completed in two phases: The first phase will include concrete approach pavement repair, and expansion joint installation. The second phase will include shot blasting the entire deck surface and sealing with an epoxy-based sealer.  

JUPITER AVENUE UPDATE (August 9): The Jupiter Avenue bridge project is proceeding on schedule and all lanes are currently open to traffic. The concrete and expansion joint repairs on the bridge have been completed and the only work that remains is to apply an epoxy seal to the bridge deck. Before the epoxy seal can be added, the concrete repairs must cure for 28 days. Therefore, we anticipate that in 3 to 4 weeks, limited lane closures will be put back into place in order to apply the epoxy seal, which takes about one week to complete. During the epoxy seal process, at least one lane of traffic in each direction will remain in place

Learn More

Kalamazoo Avenue

84th Street to 76th Street

April 3 - May 22, 2017

This project will provide for a three-lane roadway, one lane in each direction and a center turn lane. Work includes tree removal, culvert replacement, ditches, earthwork, grading, sand subbase, aggregate base, asphalt paving, pavement markings and restoration. Gaines Township will be funding sanitary sewer extension to 84th Street and sidewalk extension north to 76th Street.  

Learn More

Lappley Avenue

14 Mile Rd to 15 Mile Rd

April 25 - September 1, 2017

The reconstruction/improvement project includes necessary grading, drainage, subbase, aggregate base and construction to provide for roadway with HMA surfacing.

Learn More

Packer Drive

Rogue River Road to VanDam Avenue

July 24 - August 4, 2017

Crush & Shape

Crush & shape and resurface between VanDam Drive and the Rogue River Bridge.
Cold mill and resurface between the Rogue River Bridge and Rogue River Road.

Crush & Shape is a structural pavement treatment that grinds, or crushes, the existing asphalt and 1-2” of underlying gravel. The material is then regraded, compacted and covered with Hot Mix Asphalt (HMA). Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer with a milling machine and the replacement of the milled location with new asphalt.

Learn More

Peach Ridge Avenue

10 Mile Road - 12 Mile Road

July 7 - July 22

Crush & Shape

Crush & Shape is a structural pavement treatment that grinds, or crushes, the existing asphalt and 1-2” of underlying gravel. For this project, the material is then regraded, compacted and covered with two inch, 3C Hot Mix Asphalt (HMA). 

Learn More

Pine Island Drive

10 Mile Road to 13 Mile Road

October 25 - October 27, 2017

Project consists of Spot cold milling existing Hot Mix Asphalt (HMA) and placing new HMA.

Learn More

Ritchie Avenue

15 Mile Road to 16 Mile Road

May 22, 2017 to June 9, 2017

Crush & Shape

For this resurfacing project, the existing asphalt surface will be crushed, regraded and compacted and then covered with Hot Mix Asphalt (HMA). The project is being done to extend the service life of the road.

Learn More

Spencer Bridge #6 (21 Mile Road)

21 Mile Road over Black Creek, .5 Mile east of Keller Ave

July 17 - September 22, 2017

Remove existing triple corrugated metal pipe arches and install twin precast concrete box culverts. 

Learn More

Taos Drive

M-21 to Gravel

August 7 - August 12

Mill & Fill

Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer - and in some cases the entire asphalt pavement thickness - with a milling machine and the replacement of the milled location with new asphalt. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. curbs, driveways) must be met.

Learn More

Whitneyville Avenue at 68th Street

Intersection

September 11 - October 31, 2017

Project will consist of widening both Whitneyville Avenue and 68th Street to provide dedicated left-turn lanes and wider paved shoulders.  Project will be done under through traffic with the exception of a 2 to 3-day period where the intersection will be closed to through traffic to allow for concrete removal. Message boards announcing the closure will be posted one week in advance and a detour will be posted.