Major Road Projects

Category Navigation

Plainfield Township

Schedule Date: 2019 - TBD

Location Detail: Local Road Paving Projects

The following is a list of local road paving projects currently proposed/scheduled for the 2019 construction season. Local roads are typically shorter distance, two-lane collector roads and residential streets. Local road projects are cost-shared between the township and the Kent County Road Commission.

Information

Road Improvement Project: Full Mill & Fill

Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer - and in some cases the entire asphalt pavement thickness - with a milling machine and the replacement of the milled location with new asphalt. This process is used when a surface has deteriorated to poor condition and surrounding grades (i.e. curbs, driveways) must be met.

Roads receiving improvement:

  • Blythefield Ave. (Keswick Dr. to Riverwoods Dr.)
  • Riverwoods Dr. (Blythefield Ave. to Kuttshill Dr.)
  • Blythefield Ct. (Blythefield Ave. to End)
  • West Riverwoods Ct. (Riverwoods Dr. to End)
  • East Riverwoods Ct. (Riverwoods Dr. to End)

Patial Mill & Fill

  • Pendleton Dr. (Pine Island Dr. to End)
  • Pendleton Ct. (Pendleton Dr. to End)
  • S. Silverstone Dr. (Pendleton Dr. to End)
  • River Rock Dr. (N. Silverstone Dr. to S. Silverstone Dr.)
  • N. Silverstone Dr. (Pendleton Dr. to End)
  • Easthill Dr. (Rockbluff Dr. to End)
  • Easthill Ct. (Easthill dr. to End)
  • Rockbluff Dr. (End to End)
  • Rockbluff Ct. (Rockbluff Dr. to End)
  • Easthill Dr. (Rockridge Dr. to Rockbluff Dr.)
  • Rockridge Dr. (Pine Island Dr. to End)
  • Western St. (Pine Island Dr. to Rockridge Dr.)
  • Peterson Valley Dr. (Northland Dr. to Rex Valley Dr.)
  • Rex Valley Dr. (Peteron Valley Dr. to Rex Dr.)
  • Rex Dr. (Peterson Valley Dr. to Rex Valley Dr.) 