The project will  upgrade existing traffic signal with box span configuration, LED signal heads, and updated detection. As part of the traffic signal modernization project, sidewalk ramps will be installed to provide access to the pedestrian signal push buttons. 

Traffic Control:

Through traffic will be maintained at all times with intermittent lane closures.


Colored areas on the map indicate Kent County cities and villages NOT within KCRC jurisdiction.

Project Engineer: Eric Rodegher
Traffic Signal Engineer: Shirley Wollner
Contractor: DVT Electric