Walker Avenue

Schedule Date: April 22 - May 11, 2019

Location Detail: 5 Mile Road to 6 Mile Road

Crush & shape, repaved with 3.5 inches of Hot Mix Asphalt (HMA). Detour posted for through traffic.

Crush & Shape is a structural pavement treatment that grinds, or crushes, the existing asphalt and 1-2” of underlying gravel. The material is then regraded, compacted and covered with multiple layers of paver-placed hot asphalt.

Information

Contractor: Superior Asphalt

Closed to through traffic for project's duration. Detour posted.