Road: Lincoln Lake Avenue (Spencer Bridge #22)
Limits: over Clear Creek
Work: Bridge Rehabilitation
Start: 06/06/22
Completion: 07/01/22
Authority: KCRC
Culvert rehabilitation project to repair deteriorated portion of the existing triple corrugated metal pipe arches with reinforced concrete placed on the bottom internal portion of the galvanized metal culverts.